Skip to content

Thermal Shrink Packaging Machine

Category:

SM thermal shrink packaging machine is suitable to shrink thin shrink films such as POF, PVC, PP, POP, etc with far-infrared radiation. The thickness of shrink film should be in the range of 0.01-0.04 mm. Quartz heating pipes are located on the top, bottom and sides of the shrinking tunnel. The temperature of the shrink room and the speed of the conveyer are adjustable. And the size of shrink tunnel can be customized. Conveyor has option of chain roller and iron net conveyor for choice.

Features:

1. The lid can be open and bottom tray can be pulled out for the convenience of replacing heating pipesCompact construction, high efficiency;
2. Voltage of down heating pipes is adjustable through solid-booster, in order to control down temperature. The temperature of whole shrink tunnel is controlled through AC contactor.
3. Strong air-flow ensures excellent heat distribution for an even shrinking;
4. Intelligent temperature controlling system makes the operation easily;
5. The speed of the conveyer is adjustable

Technical Parameter

Model SM-4020 SM-4035 SM-4525 SM-3015
Voltage 220V 380V-50/60HZ 220V 380V-50/60HZ 220V 380V-50/60HZ 220V 380V-50/60HZ
Power 7KW 9KW 9.6KW 6KW
Shrinking tunnel 800*400*200mm 800*400*350mm 800*450*250mm 800*300*150mm
Driving speed 0-10m/min 0-10m/min 0-10m/min 0-10m/min
Driving mode 10kgs 10kgs 10kgs 25kgs
Temperature 0-300℃ 0-300℃ 0-300℃ 0-300℃
Film material PVC POF PVC POF PVC POF PVC POF
Dimension 1100*600*790mm 1100*600*805mm 1100*650*795mm 1100*500*780mm
Weight 60KGS 65KGS 65KGS 50KGS

 

About us

We have more than 20 years knowledge and experience on PET Water/juice/carbonated drinks production line. Our exporting product includes: Injection molding machine, PET preform mould, plastic bottle blowing machine, Water treatment system, Filling machine and Packaging machine etc.

 

Q: What is the warranty if we buy your machines?

A: We offer the high quality machines with 1 year guarantee start from the machine reach to your factory. Also your share the lifelong technical support.

Q: How about the spare parts?

A: We will send one year enough spare parts together with machines for your stock. During the warranty time, if some spare parts broke without human problem, we will send free for you.

Q: How to install my machines when it arrives? What is the cost?

A: We will send our engineer to your factory to install the machines and train your engineers how to operate and maintain the machines. Customer pay for visa, round-trip tickets, room and accommodation, also USD80/day/ person(engineer salary).

Q: How long time for installation?

A: According to the machine you order, usually we will send one or two engineer, it takes about 7to 20days.

Q: When can I get my machine after I paid?

A: Usually the production time is around 25-60 days. The exactly will be decided by which machine u order.