Skip to content

Screw Compressor

Category:

Excellent optimized design and industrial testing provide extremely high reliability and significantly reduce operational and maintenance costs.
The compressor IoT system reduces the need for maintenance, effectively improving the utilization rate of the compressor.

Features

Excellent optimized design and industrial testing provide extremely high reliability and significantly reduce operational and maintenance costs.
The compressor IoT system reduces the need for maintenance, effectively improving the utilization rate of the compressor.

Supply Scope:

  1. Power range: 4kW400kW
  2. Airflow range: 0.5100m³/min
  3. Pressure range: 1.5~35bar

 

Technical Parameter

Model Discharge Pressure
(Mpa)
Displacement
(m³/min)
Power
(kw)
Connection Weight
(kg)
Overall Dimensions
(mm)
BK7.5-8G 0.8 1.2 7.5 G3/4″ 200 880×620×800
BK11-8G 0.8 1.7 11 G1″ 265 1000×670×1090
BK15-8G 0.8 2.4 15 G1″ 280 1000×670×1090
BK18-8G 0.8 3.0 18.5 G1″ 380 1200×800×1120
BK22-8G 0.8 3.6 22 G1″ 400 1340×850×1120
BK30-8G 0.8 5 30 G1 1/2″ 550 1340×850×1130
BK37-8G 0.8 6 37 G1 1/2″ 570 1340×850×1130
BK45-8G 0.8 7.1 45 G1 1/2″ 740 1480×1030×1365
BK55-8G 0.8 10 55 G1 1/2″ 800 1480×1030×1365

 

 

About us

We have more than 20 years knowledge and experience on PET Water/juice/carbonated drinks production line. Our exporting product includes: Injection molding machine, PET preform mould, plastic bottle blowing machine, Water treatment system, water bottle filling machine and Packaging machine etc.

 

Q: What is the warranty if we buy your machines?
A: We offer the high quality machines with 1 year guarantee start from the machine reach to your factory. Also your share the lifelong technical support.

 

Q: How about the spare parts?
A: We will send one year enough spare parts together with machines for your stock. During the warranty time, if some spare parts broke without human problem, we will send free for you.

 

Q: How to install my machines when it arrives? What is the cost?
A: We will send our engineer to your factory to install the machines and train your engineers how to operate and maintain the machines. Customer pay for visa, round-trip tickets, room and accommodation, also USD80/day/ person(engineer salary).

 

Q: How long time for installation?
A: According to the machine you order, usually we will send one or two engineer, it takes about 7to 20days.

 

Q: When can I get my machine after I paid?
A: Usually the production time is around 25-60 days. The exactly will be decided by which machine u order.