Skip to content

Automatic sleeve wrapper & PE film shrink tunnel

Category:

Features:

This machine is based on a sleeve wrapper machine.It is suitable for large cartons outside PE film wrapper.Customers use that kind of machine to keep cartons safe and clean. It also helps people to carry it easily.

Advantages of the machine:

  1. High-power fan motor make great shrink effect.
  2.  Using Teflon cover for a cutter, film sealing part fastness
  3.  human-computer interface——–
    1).automatic calculation of package length.
    2)It can save packing plan for next time.

Technical Parameter

Sleeve wrapper
Model BZJ-6040AF
Voltage 220/50Hz
Power 2.4KW
Max.packaging size 450×350×380mm
Min.packaging size 250×60×100mm
Packaging speed 0-10pcs/min
Sealing time 0-3S
Push plate load 25kg
Film width/thickness 580mm/0.03-0.12mm
Film material PE/PP/P0F
Working air pressure 0.4-0.8mpa
Programmable logic controller(plc) Omron
Dimension 3240×1400×2200mm
Weight 280KG
Tunnel
Model BS-6050
Voltage 380V-50Hz
Power 24KW
Shrinking tunnel 1800×600×500mm
Conveyor speed 0-10m/min
Coveyor load 60kg
Temperature 0-300℃
Film material PE/PP/P0F
Dimension 3250×950×1850mm
Weight 400kg

 

About us

We have more than 20 years knowledge and experience on PET Water/juice/carbonated drinks production line. Our exporting product includes: Injection molding machine, PET preform mould, plastic bottle blowing machine, Water treatment system, Filling machine and Packaging machine etc.

 

Q: What is the warranty if we buy your machines?

A: We offer the high quality machines with 1 year guarantee start from the machine reach to your factory. Also your share the lifelong technical support.

Q: How about the spare parts?

A: We will send one year enough spare parts together with machines for your stock. During the warranty time, if some spare parts broke without human problem, we will send free for you.

Q: How to install my machines when it arrives? What is the cost?

A: We will send our engineer to your factory to install the machines and train your engineers how to operate and maintain the machines. Customer pay for visa, round-trip tickets, room and accommodation, also USD80/day/ person(engineer salary).

Q: How long time for installation?

A: According to the machine you order, usually we will send one or two engineer, it takes about 7to 20days.

Q: When can I get my machine after I paid?

A: Usually the production time is around 25-60 days. The exactly will be decided by which machine u order.