Skip to content

Cooling Tower

Category:

Open circuit cooling tower

Technical Parameter

Specs Nominal Flow Rate (m³/h) Overall Size (mm) Fan Diameter Fan Motor Power (kW) Rated Current (A) Pump Head Weight – Standard Model Weight – Low Noise Model
28℃ 27℃ Height (H) Diameter (D) N.W Operating Weight N.W Operating Weight
LH-8T 5 6 1620 940 510 0.25 0.83 1.3 53 139 61 148
LH-10T 7 8 1670 1100 530 0.25 0.83 1.3 56 139 64 156
LH-15T 10 12 1770 1210 590 0.37 1.74 1.4 84 219 92 241
LH-20T 13 15 2030 1380 740 0.37 1.74 1.4 110 265 124 295
LH-25T 16 20 2150 1380 770 0.55 1.74 1.4 140 300 158 334
LH-30T 22 25 2100 1550 770 0.55 1.74 1.6 160 364 174 404
LH-40T 25 30 2350 1680 880 0.75 3.2 1.8 165 365 185 410
LH-50T 35 40 2500 1870 880 1.1 3.2 1.8 191 433 215 481
LH-60T 45 50 2800 2095 1160 1.5 5.2 1.8 368 730 412 810
LH-70T 55 60 2780 2280 1160 1.5 5.2 2 423 753 476 839
LH-80T 65 70 2780 2280 1160 1.5 5.2 2 521 913 584 1015
LH-100T 75 80 2890 2650 1450 2.2 5.8 2.2 607 1023 680 1137
LH-125T 90 100 2830 2900 1450 2.2 5.8 2.2 695 1130 776 1255
LH-150T 115 125 2830 2900 1450 3 7.7 2.2 730 1165 815 1298

 

 

About us

We have more than 20 years knowledge and experience on PET Water/juice/carbonated drinks production line. Our exporting product includes: Injection molding machine, PET preform mould, plastic bottle blowing machine, Water treatment system, Filling machine(including 5L water filling machine) and Packaging machine etc.

 

 

Q: What is the warranty if we buy your machines?

A: We offer the high quality machines with 1 year guarantee start from the machine reach to your factory. Also your share the lifelong technical support.

Q: How about the spare parts?

A: We will send one year enough spare parts together with machines for your stock. During the warranty time, if some spare parts broke without human problem, we will send free for you.

Q: How to install my machines when it arrives? What is the cost?

A: We will send our engineer to your factory to install the machines and train your engineers how to operate and maintain the machines. Customer pay for visa, round-trip tickets, room and accommodation, also USD80/day/ person(engineer salary).

Q: How long time for installation?

A: According to the machine you order, usually we will send one or two engineer, it takes about 7to 20days.

Q: When can I get my machine after I paid?

A: Usually the production time is around 25-60 days. The exactly will be decided by which machine u order.