Skip to content

Vacuum Autoloader

Category:

The main engine and the material hopper are designed separately, and thus it is safe, easy and convenient to operate. The whole operation is controlled by MicroTrip computer. Equipped with an independent filter, which is very convenient to clean up dust. The equipped muffler reduces the noise in operation. XTL-9ooGN-2 controlling two suction hoppers by one single controller not only can avoid taking space but also manage conveniently. The air revolving dust arrester reduces the cleaning times of the filter, is suitable for the ground material.

 

Features

  • Stainless steel material hopper is light in weight, durable and very convenient for cleaning the device.
  • The control box, being designed separately, is easy to be well maintain.
  • Auto-buzzer will give alarm while lacking material.
  • Auto-protective device protects motor against overloading.
  • The bunker with an electronic eye can be installed on the charging inlet of the molding machine directly.
  • Can select a two-material proportional valve, used for new material mixed grinded material using or instant receiving of ground material.

Technical Parameter

Injection Molding Auto Loader

 

About us

We have more than 20 years knowledge and experience on PET Water/juice/carbonated drinks production line.

Our exporting product includes: Injection molding machine, PET preform mould, plastic bottle blowing machine, Water treatment system, water bottle filling machine and Packaging machine etc.

 

Q: What is the warranty if we buy your machines?
A: We offer the high quality machines with 1 year guarantee start from the machine reach to your factory. Also your share the lifelong technical support.

 

Q: How about the spare parts?
A: We will send one year enough spare parts together with machines for your stock. During the warranty time, if some spare parts broke without human problem, we will send free for you.

 

Q: How to install my machines when it arrives? What is the cost?
A: We will send our engineer to your factory to install the machines and train your engineers how to operate and maintain the machines. Customer pay for visa, round-trip tickets, room and accommodation, also USD80/day/ person(engineer salary).

 

Q: How long time for installation?
A: According to the machine you order, usually we will send one or two engineer, it takes about 7to 20days.

 

Q: When can I get my machine after I paid?
A: Usually the production time is around 25-60 days. The exactly will be decided by which machine u order.